Flood Mitigation in the South-East of Mauritius and in Rodrigues

Land Drainage, Flood Prevention and Mitigation

Following a period of intense rainfall in April 2021, flash floods occurred in the south east of the  island, more pronounced along the coastal area  between “Bambous Virieux” to the north and “Rivière de s Créoles” to the south.

The Republic of Mauritius through the Ministry of National Infrastructu  re through the National Development Unit launched the emergenc y project w hich consists of consultancy services for the design, and management of flood mitigation measures in the South-East Region (“Rivière des Creoles, Vieux Grand Port, Bois Des Amourettes, Anse Jonchee, Bambous Virieux”).

Recent Projects

FASEP and ADAPT’ACTION in Rodrigues

ESIA for Airport Extension of Rodrigues

Flood Mitigation in the South-East of Mauritius and in Rodrigues